Construction on the elevator is well underway. The elevator pit has been constructed inside the basement, and the wood framing for the elevator shaft is proceeding. Outside construction for the entry room will continue as weather allows. The elevator equipment is scheduled to arrive in the latter part of April so most of the interior construction will be done by then.